Main Menu

NEWSLETTER

We periodically publish a newsletter with product improvements, job stories, pictures submitted by customers, and all sorts of good info. SUBSCRIBE HERE.

Photo Highlights

Non Stop Scaffolding > Photo Gallery > Jobs - Heavy Duty

Photo Gallery

Radius Wall (1167 views)

March 20, 2008
Radius Wall (1347 views)

March 20, 2008
Long, straight wall (1447 views)

March 20, 2008
ROOM, ROOM AND MORE ROOM (1238 views)
HEAVY-DUTY is like a dance floor in the sky. With 5 boards on the back, a pallet of block can be landed in any or all bays, with more than enough room for your men to move around.
March 20, 2008
Heavy Duty Racked (1224 views)

March 20, 2008
ELEVATOR SHAFTS, TOO (1305 views)
HEAVY DUTY isn't just for outside walls. Since it turns corners so easily, HEAVY DUTY is ideal for elevator shafts.
March 20, 2008
Ultimate Load Test (1402 views)
That's 2800 brick.
March 20, 2008
BIG-BOX STORES (1149 views)
Long, straight walls positively fly with HEAVY DUTY. It's fast to set up, and even faster to move from wall to wall, at only about 3 hours between topout time and laying the first block in the new walls.
March 20, 2008
Radius Wall (1019 views)

March 20, 2008
Heavy Duty in an unusual setup (1141 views)

March 20, 2008
Heavy Duty with Casters (1166 views)

March 20, 2008
Feeding material with a crane (1072 views)

March 20, 2008
Flying towers in with a crane (1186 views)

March 20, 2008
Standard Plank Layout (693 views)
Standard Plank Layout
April 28, 2009
Toe Board Keepers (437 views)
Toe Board Keepers - One for corners with two loops and one for the middle of the run with one loop.

October 26, 2009
1314 Hoadley St. | Shreveport, LA 71104 | 800.845.0845

Powered by Majicko1.4.0! ©2007-2009 Bandwise LLC